Lines
M1A Yenikapı - Ataturk Airport is the first rail system operation of Metro ...
M1B operation is carried out jointly between Yenikapi and Otogar stations ...
Passengers going to Seyrantepe direction are required to transfer from ...
The 26.7 km long line serving between Bakırköy Sahil and Kayaşehir Merkez ...
The construction of the 1st phase of the line was completed in 2012 and ...
M5 Line is the second metro line of the Anatolian Side, and it is the first ...
M6 Metro Line ensures the access of passengers arriving from M2 Yenikapi ...
M7 Yildiz-Mahmutbey Metro Line is commissioned as the first fully automatic ...
The construction of the line, which started by IMM in February 2016, was ...
M9 Ataköy-Olimpiyat metro line connects the Atatürk Olympic Stadium and ...
The first stage of the line was built between Sirkeci and Aksaray and the ...
Starting passenger service on 1st November 2003, Kadikoy-Moda Tram Line ...
T4 Tram Line was started to carry the passenger traffic of the Sultançiftliği ...
The first stage of the line is in between Cibali and Alibeyköy and the ...
Railway projects and construction have recently been accelerated to integrate and modernize Istanbul’s ...
The line is built between Rumeli Hisarustu region and Asiyan Park located on the Bosphorus coast. The ...
Starting operations on 11th April 1993 and serving between Taksim Taskisla and Macka districts, the aerial ...
As one of the projects launched to rejuvenate the Golden Horn as part of the IMM’s Urban Design Project ...