Projects
The line is planned to start at ITU-Maslak area and terminate ...
The line is planned as the 13-station initial section of the ...
The line is planned as an extension of M4 Kadikoy-SGH and M10 ...
The line will start at Seyrantepe Metro Station and integrate ...
The line will be built as an extension of Vezneciler-Sultanciftligi ...
The line will start at the historical Inner City Walls section ...
The line will be built as an extension of the existing M2 Yenikapi-Haciosman ...
The line will be built as the 3rd phase extension of M3 Line. ...
The line will start at M1B Menderes Station area, and extend ...